Basement Waterproofing CollingwoodBASEMENT WATERPROOFINGCollingwood
Home Services Exterior waterproofing

Exterior basement waterproofing in Collingwood

The wall is dug out to the footing, cleaned, sealed and drained from the outside. It is the more disruptive method, and it is the only one that keeps water out of the wall itself.

The method

What exterior waterproofing includes

The soil is excavated to the footing. The wall is cleaned, parged where it needs it, and sealed with a rubberised membrane that carries over the wall/footing joint. Dimple board goes over the membrane, a new perforated pipe is bedded in clear stone and wrapped in filter fabric, and the trench is backfilled with the grade corrected to fall away.

  • Spring to late autumn
  • Saturated walls
  • Failed original drain
  • New drain included
Downspout discharging straight onto the ground at the base of a stone wall
Before we quote a trench we look at what the roof is doing. This much water beside a wall changes the diagnosis.

Around Collingwood the reason is usually one of two. Either the original weeping tile has silted up — clay tile does that, and nothing you do inside changes it — or the wall has sat saturated in clay for decades and is giving up: soft mortar, spalling block faces, a bow you can see with a straight edge. Sealing that wall on the inside does not help. Where the outside genuinely cannot be opened, interior drainage is the alternative, and the assessment is what decides between them.

DRY BASEMENTGRADE FALLS AWAY FROM THE WALLCLEAR STONEWATERPROOF MEMBRANEDIMPLED DRAINAGE BOARDNEW PERFORATED PIPEFILTER FABRICBACKFILL IN LIFTS
Exterior system in section: membrane from grade down over the footing joint, dimple board, clear stone and filter fabric around a new perforated pipe, backfill with the grade falling away. New work in green.
Residential street and houses under fresh winter snow

Timing

The melt is the real test

Meltwater cannot drain down through ground that is still frozen, so it runs sideways and stands in the backfill beside your wall for days.

The work

How the days run

  1. Locates and protection

    Utilities marked on site. Access route planned, driveway protected, spoil placement agreed.

  2. Excavate to the footing

    To the base of the footing, trench cut back safely. Shoring is a safety decision, not a budget one.

  3. Clean and prepare the wall

    Old coatings and loose material off; voids and open joints parged so the membrane has something to bond to.

  4. Membrane and dimple board

    Rubberised membrane from grade down and over the footing joint, then dimple board to hold water off the wall.

  5. New drain in clear stone

    Perforated pipe laid to fall, bedded and covered in clear stone, wrapped in filter fabric.

  6. Backfill and grade

    Backfilled in lifts, grade set to fall away, downspouts extended past the trench.

Waterproofing membrane and flashing sealed at the base of a foundation wall
The joint gets sealedThe wall/footing joint is where most exterior leaks start, so the membrane carries over it.
Clean washed limestone clear stone, the bedding a new drain needs
Clear washed stoneNot pit run, not the spoil that came out. Fines are what kill a drain.
Grey angular crushed stone of the size used around a perforated drain
Wrapped in fabricFilter fabric over the stone keeps silt out of the voids the water travels through.

Before you dig

Check the surface water first

On a lot of houses surface water is a real share of the problem, and it costs almost nothing to fix.

  • Downspouts discharging within a metre of the wall.
  • Grade that has settled and now falls back toward the house.
  • Window wells with no working drain.
  • An interlock patio pitched at the foundation.

None of it substitutes for a failed drain. But we will point it out whether or not you hire us.

at least 2 mWINDOW WELLWITH A DRAINnot a gravel bottomGROUND FALLS AWAYON EVERY SIDE
Downspouts extended clear of the backfill, ground falling away on every side, window wells drained.
Trench dug along a house foundation with formwork in place
An open trench is the only time anyone gets to see what is actually against your wall.

Questions

Questions about exterior work

How long does exterior waterproofing take?

For one elevation of a typical house, plan on the trench being open for several days: a day to excavate, a day to prepare and seal the wall, a day for stone, pipe and dimple board, then backfill and reinstatement. Weather moves it.

Will my garden survive?

Lawn and small planting will not survive the trench line — that is the trade-off. Established shrubs can sometimes be lifted and heeled in, and mature trees are a real constraint we look at before quoting. Anything that has to be removed is listed in the written scope before you agree.

Do you have to dig the whole house?

Usually not. Most houses leak on one or two elevations — the ones taking runoff from the escarpment side, or the ones with the failed downspout. We scope the wall that is wet.

What about the utilities?

Locates are arranged before excavation, and gas, hydro, water and communications services are marked on site. Where a service crosses the trench line, that section is hand-dug. This is not optional and it is not a place to save time.

Wall damp right through, not just at the floor?

Exterior is usually the answer for that, and we will show you why on site before quoting it.

Call Book a free assessment